Living Shorelines in Action
August 06, 2026
During one of July's (2026) heatwaves, our Pewaukee restoration crew traded dry land for overtopped boots to complete the first phase of a shoreline stabilization project on a local lake.
The team received a brief tutorial and then installed biodegradable coir sediment logs along the shoreline to provide immediate protection from wave action and erosion while creating the foundation for a future living shoreline. Each log was carefully anchored with untreated hardwood stakes and secured to maintain continuous contact with the lakebed, ensuring long-term performance as native vegetation becomes established.
Next up: late-summer native seeding and shoreline plug planting. As the coir logs naturally biodegrade, the developing root systems of native plants will take over, creating a stable, resilient shoreline that protects water quality while enhancing wildlife habitat.
"What a fun new work experience today! It was fun to wade in the water, and I'm looking forward to creating the 'living shoreline' along the lake."
– Heartland crew member
Author: Jenny Grimes
Photos by: Clay Frazer and Jenny Grimes